AW5532E features of TECUMSEH fully enclosed piston compressor in Taikang, France:
1. Voltage design of "Taikang" compressor series: single camera operating voltage 180-240V, three-phase machine 340-440V, especially suitable for China's national conditions.
2. Taikang series compressors are long-term applicable in different climatic conditions in China and Southeast Asia. They have been tested for a long time and have stable and reliable performance.
3. Taikang compressor has 1/12-12 pieces, 10 series, hundreds of models, commercial refrigeration compressor is the most famous.
4. Taikang's large F-class insulated motor with high efficiency and low slip ensures high refrigeration capacity, low power consumption and operation safety of the compressor.
5. The optimum balance design of Taikang compressor makes the compressor vibrate less, noise lower and run more smoothly.
Attention should be paid to the application of TECUMSEH fully enclosed piston compressor AW5532E in Taikang, France.
1. How to do a good job of system cleanliness
* Before using the compressor, it is absolutely necessary to remove all dirty substances from the system, such as water, metal debris, cleaning agents and chemicals, so as to avoid the burning of the compressor.
* Before assembling the system, all components must be removed from water and filled with nitrogen, and copper tubes are used for the refrigeration grade of smooth annealing.
* After the system is flushed with trichloroethylene, dry air or nitrogen must be used to remove residual trichloroethylene.
2. Best welding method
When welding copper pipe joints, it is necessary to fill the pipe with low-pressure nitrogen and use appropriate flux to help welding, so as to avoid copper oxide film caused by oxidation inside the copper pipe.
Before welding, all joints to be welded must be thoroughly cleaned and grease removed. Phosphorus-copper alloy flux should be used for copper pipe and copper pipe welding. Silver-copper flux should be used for copper pipe and steel pipe welding. Oxyacetylene is the most suitable welding tool.
3. Attention should be paid to the omission:
When the system is completed, it must be properly filled with dry air or nitrogen to keep the pressure.
The best way is to test leaks with an electronic leak detector. Of course, leaks can also be checked in traditional ways.
Please do not fill the system with air or R134A.